Installation Guidance

Plan installation before the equipment arrives.

A useful installation plan covers placement, electrical capacity, condensate drainage, refrigerant handling, access, noise, permits, and final acceptance checks.

Before quote

Site constraints

Confirm room layout, outdoor-unit location, drain route, service access, wall or window limits, and any building or lease rules.

Before handover

Acceptance evidence

Ask for commissioning notes, model numbers, warranty details, operating guidance, filter access, and signs that require service.

Read installation guidance